Page 19 - Schemes of horticulture Department - English
P. 19

ocedur
                                                                                                                                                ocedur
                                                                                                                                                      e
                                                                                                                          Eligibility Criteria &Procedure e
                                                                                                                          Eligibility Criteria &Pr
                                                                                                                          Eligibility Criteria &Pr
                                Interventions
                  S.No.
                                Interventions
                  S.No.         Interventions                               Rate of  Assistance
                  S.No.
                                                                            Rate of Assistance
                                                                            Rate of Assistance
                                                                                                                        for
                                                                                                                        for Applying to avail the AssistanceAssistance
                                                                                                                        for     Applying to avail the  Assistance
                                                                                                                           Applying to avail the
                  4.    Construction of micro irrigation   50% of  cost (Shallow/medium Bore wells) limited to
                        structures to supplement source   Rs 0.25 lac per unit
                        creation activities including
                        shallow/medium tube wells and
                        dug wells (in areas where ground
                        water is available and not under
                        semi critical /critical /over expl-
                        oited category of development)
                  5.    Restoring the potential of       50% of the cost (Desilting and deepening of Khuls/ponds) of
                        traditional water storage systems  renovation limited to Rs. 0.15 lac per unit
                        like Khuls/Ponds through
                        disiltation and deepening activities
                                                         50% of the cost ( Construction cost Rs. 0.00125 lac per cubic
                                                         metre for Plain and Rs. 0.0015 lac per Cubic metre for Hilly
                                                         Hilly Areas) limited to  Rs 0.75 lac for  Plain areas and
                                                         Rs 0.90 lac  in Hilly  areas including Lining on pro rata basis        Any person can apply to
                                                         (cost for non  lined tanks 30% less)                             concerned CHO /HDO
                  6.    Water Harvesting structures such  Rs 1.50 Lac (Water storage in farm pond/Dug well (20m× 20m×    who has his own Orchard with
                        as Check dams, Nala bund, Farm  3m)) per beneciary  for plane areas and Rs 1.80 lac per          recommendation(s) from PRI
                        ponds, Tanks etc                 beneciary for hilly areas with 300 micron plastic lining/RCC
                                                         lining for 2 Ha Command area, for smaller size ponds/dug well
                                                          cost will be pro- rata basis
                                                         50% of the cost (Construction of Brick Massonary concrete
                                                          secondary Structure with protective space) Limited to Rs 0.0035
                                                          lac per cum of Storage Capacity. Maximum permissible
                                                          assistance will  be Rs 2.00 lac per beneciary.
                  7     Water Harvesting and             50 % of the cost (Lining of tanks/Ponds constructed) of plastic/
                        Management                       RCC Lining  limited to Rs 0.25 lac per Pond/Tank













                                                                                    17
   14   15   16   17   18   19   20   21   22   23   24