Page 19 - Schemes of horticulture Department - English
P. 19
ocedur
ocedur
e
Eligibility Criteria &Procedure e
Eligibility Criteria &Pr
Eligibility Criteria &Pr
Interventions
S.No.
Interventions
S.No. Interventions Rate of Assistance
S.No.
Rate of Assistance
Rate of Assistance
for
for Applying to avail the AssistanceAssistance
for Applying to avail the Assistance
Applying to avail the
4. Construction of micro irrigation 50% of cost (Shallow/medium Bore wells) limited to
structures to supplement source Rs 0.25 lac per unit
creation activities including
shallow/medium tube wells and
dug wells (in areas where ground
water is available and not under
semi critical /critical /over expl-
oited category of development)
5. Restoring the potential of 50% of the cost (Desilting and deepening of Khuls/ponds) of
traditional water storage systems renovation limited to Rs. 0.15 lac per unit
like Khuls/Ponds through
disiltation and deepening activities
50% of the cost ( Construction cost Rs. 0.00125 lac per cubic
metre for Plain and Rs. 0.0015 lac per Cubic metre for Hilly
Hilly Areas) limited to Rs 0.75 lac for Plain areas and
Rs 0.90 lac in Hilly areas including Lining on pro rata basis Any person can apply to
(cost for non lined tanks 30% less) concerned CHO /HDO
6. Water Harvesting structures such Rs 1.50 Lac (Water storage in farm pond/Dug well (20m× 20m× who has his own Orchard with
as Check dams, Nala bund, Farm 3m)) per beneciary for plane areas and Rs 1.80 lac per recommendation(s) from PRI
ponds, Tanks etc beneciary for hilly areas with 300 micron plastic lining/RCC
lining for 2 Ha Command area, for smaller size ponds/dug well
cost will be pro- rata basis
50% of the cost (Construction of Brick Massonary concrete
secondary Structure with protective space) Limited to Rs 0.0035
lac per cum of Storage Capacity. Maximum permissible
assistance will be Rs 2.00 lac per beneciary.
7 Water Harvesting and 50 % of the cost (Lining of tanks/Ponds constructed) of plastic/
Management RCC Lining limited to Rs 0.25 lac per Pond/Tank
17